By the Editorial Team · Last updated: 15 November 2026 · 10-minute read

Quick summary: a straightforward single-storey extension in London commonly budgets at around £2,300–£4,400 per m² for the build, excluding VAT and professional fees. The UK-wide guide range is lower: £1,800–£3,000 per m², according to Checkatrade's 2026 cost guide. Your finished project total can rise significantly once you add professional fees, VAT, a kitchen, and a higher specification.

💡 Key Points

  • A 30m² London rear extension could cost around £69,000–£132,000 for the build alone at the rates above (£2,300–£4,400 per m²), before VAT, professional fees and contingency.
  • Side-return extensions can cost more per square metre because they add less floor area and can be complex to build.
  • Check whether each quote includes VAT, finishes, services, waste removal and professional fees.
  • Set aside a 10–15% contingency for unexpected work and agreed variations.

1. How Much Does a House Extension Cost in 2026?

The house extension cost depends on floor area, the type of extension, site conditions and what is included in the build. Published prices are best treated as early budgeting guides, not quotes for your home.

Checkatrade's 2026 guide puts a standard UK extension at around £1,800–£3,000 per m², excluding VAT. London guides tend to be higher: Resi's November 2026 guide gives £2,800–£4,400 per m² for a London rear extension and £3,900–£5,000 per m² for a side infill. Those figures are indicative benchmarks, and the scope behind each guide may differ.

We have also reviewed guidance from Extension Architecture and My Home Extension. Their material is useful for understanding design, planning and budgeting, but it does not provide the same directly comparable, current London cost basis as the latest Checkatrade and Resi figures. Compare the assumptions, not just the headline price.

House extension prices by type

The table below is for early budgeting. Except where noted, allow for the build only; VAT, professional fees and some fittings may be extra. Rates vary by size, design and specification.

Extension type Indicative London build cost per m² What to bear in mind
Single-storey £2,300–£4,400 Broad guide; a simple design may cost less than a high-specification one
Double-storey £1,900–£3,250 Indicative rate across both floors; total cost is higher because you build more area
Rear extension £2,800–£4,400 Resi's 2026 benchmark for a typical London rear extension
Side return extension £3,900–£5,000 A narrow infill can involve complex structure and restricted access
Wrap-around £2,850–£3,450 Resi's indicative first-fix benchmark; design and area affect the rate
Kitchen extension £2,800–£4,800 Broad build allowance; kitchen units, appliances and premium finishes can add substantially

A double-storey extension can be cheaper per square metre than a single-storey one because the foundations and roof serve two floors. That does not make it cheaper overall: the larger total floor area, structural requirements and work at height still add cost.

A kitchen extension also has costs beyond the structure. Checkatrade estimates that a kitchen fit-out may add around £15,000–£35,000, depending on the units, appliances and work involved.

⚠️ Watch Out

A low rate may cover a shell only, not a finished room. Check whether it includes insulation, windows and doors, electrics, plumbing, plastering and flooring.

2. What Makes London Extension Costs Different?

London sites can be harder to build on than the national averages assume. The cost is affected not just by the amount of work, but by how easily people, machinery and materials can reach the site.

Groundworkers installing steel reinforcement for strip foundations at a London house extension
Foundation work for a London rear extension — ground conditions and access often drive the final price.
  • Tight side access: A narrow passage may prevent machinery from reaching the garden. More work may need to be done by hand, adding time and labour.
  • Ground conditions: London clay and nearby trees can affect foundation design. The right solution depends on the site investigation and structural design; deeper or specialist foundations may add cost.
  • Drainage: Existing drains may run where the extension is planned. Investigations, diversions or a sewer build-over agreement can add work and time.
  • Party Wall matters: Work on or near a shared wall, or excavation close to a neighbour's foundations, may require notice under the Party Wall etc. Act. Surveyor costs may apply.
  • Skips and scaffolding: A skip on a public road may require a council licence. Scaffolding that occupies public space or affects neighbouring property needs to be planned and agreed in advance.
  • Labour and logistics: Labour rates, parking, deliveries and limited space for storing materials can all increase the cost of a London project.

Good site information helps builders price these risks earlier. Our groundworks service covers site preparation, foundations, drainage and concrete works.

3. What Might a 30m² Extension Cost?

Here is an illustrative example for a 30m² London rear extension with a standard specification. It is not a quote: actual scope and prices vary. The figures show why a build-rate estimate is not the same as the total project budget.

Cost area Example allowance
Structural work and groundworks, including foundations £18,000
Building work, roof and external envelope £35,000
Services, including plumbing and electrics £7,000
Internal finishes and basic fit-out £15,000
Illustrative build subtotal £75,000
Professional fees: architect, structural engineer and Building Regulations £12,000
Contingency at 10–15% of build subtotal £7,500–£11,250
VAT, illustrated at 20% on taxable work and fees Approximately £18,900–£19,650
Indicative total Approximately £113,000–£118,000

VAT treatment can vary by the work and the items charged. The example applies 20% to the assumed taxable costs for simplicity; it does not calculate separate statutory charges or other exceptions. Ask your professionals and builder how VAT applies to your project, and whether each figure in the quote is inclusive or exclusive.

The professional-fee allowance is a single illustrative budget, not a fixed market rate. Ask for separate figures for the architect or designer, structural engineer, Building Regulations drawings and application, and any other consultant. Planning permission, Party Wall costs and drainage investigations may also need separate allowances.

Homeowners reviewing extension drawings and a cost breakdown with a builder at their kitchen table
Compare quotes item by item — scope, allowances and VAT treatment matter as much as the headline figure.

4. Why Can Quotes Differ by £20,000 or More?

Two builders can look at the same brief and still price different work. A £20,000-plus gap may reflect a genuine difference in scope, assumptions or specification, not just a difference in margin.

Common reasons include:

  • One quote includes VAT and another does not.
  • A quote includes the kitchen, glazing, flooring or decorating while another excludes them.
  • The builders have assumed different foundation depths or drainage work.
  • One price includes structural steel and making good after opening up the existing wall; another leaves these out.
  • Provisional sums or product allowances differ. A low allowance can mean a larger bill when you choose the actual items.
  • Waste removal, scaffolding, skip licences, protection of the home or external works are not treated consistently.
  • The drawings or specification are incomplete, so each builder has priced a different project.

Send the same drawings and specification to each builder. Then compare item by item, including exclusions, allowances and VAT. For more help, see our guides to avoiding hidden builder costs and planning an extension design step by step.

5. What Should You Check Before Signing?

Use this checklist to compare quotes on the same basis:

  • Is the work scope described clearly and linked to the drawings?
  • Is the price fixed, estimated or subject to remeasurement?
  • Is VAT included? At what rate?
  • Are foundations, drainage and any investigation work included?
  • Are structural steel, support and making good included?
  • Are windows, doors and rooflights specified?
  • Are plumbing, electrics and heating changes included?
  • Are plastering, flooring, decorating and kitchen fittings included?
  • Are skip hire, waste removal, scaffolding and site protection included?
  • Are professional and statutory fees listed separately?
  • Are provisional sums and product allowances explained in writing?
  • Is there a written process for approving variations and making stage payments?

A well-defined quote helps you understand what you are committing to before work begins. You can read more about residential construction with Thane Construction.

6. Frequently Asked Questions

How much does a house extension cost in 2026?

A standard UK extension is commonly estimated at £1,800–£3,000 per m², excluding VAT, in Checkatrade's 2026 guide. London rates can be higher: Resi's 2026 guide gives £2,800–£4,400 per m² for a typical London rear extension. Fees, VAT and fittings may be extra.

Is a single or double-storey extension cheaper per m²?

A double-storey extension is often cheaper per square metre because it shares the cost of foundations and the roof across two floors. Its overall cost is usually higher because it creates more floor area and involves additional structural work.

Does the extension cost include VAT?

Not always. Cost guides and builders may show prices excluding VAT, while others may quote an inclusive total. Ask for the VAT rate and amount to be stated clearly in the written quote.

How much contingency should I allow?

A useful starting point is 10–15% of the build cost. Consider the higher end if the property is older, ground conditions are uncertain or the design is still changing. Contingency is a reserve, not an allowance for optional extras.

Do I need planning permission for a house extension?

Some extensions may fall within permitted development rights, but limits apply and some properties have additional restrictions. Check your specific plans and property with your local planning authority or a qualified professional before starting. Building Regulations approval is a separate process.

How long does a house extension take?

The build itself can take several months, depending on size, design and site conditions. Design, approvals, Party Wall matters and choosing a builder add time before construction begins. Agree a realistic programme with your builder once the scope is fixed.

Get a Detailed Quote Before You Commit

Thane Construction has been established since 2014 and has completed more than 50 projects. Our CSCS-certified team works with a dedicated project manager, and we provide itemised, transparent quotes with no hidden fees and a 12-month workmanship warranty. We are fully insured for public liability, employer's liability and professional indemnity.

To be clear about our coverage: our residential extension work is currently limited to IG5, IG7 and IG8, Clayhall and Barkingside, Chigwell, and Woodford Green. Our groundworks and engineering services cover London boroughs inside the M25.

If your property is in our residential area, we offer a free site visit and quote.